
プロフェッショナル BIMチーム
年
2018
プロジェクトステータス
Completed
プロジェクトタイプ
Condominium
期間
5 ヶ月
クライアント
Ap (thailand)
We are a part of AP BIM Pilot Project, working under JAI Group as Architectural and interior BIM modeler developed BIM model for drawings production, clash detection, takeoff quantification from BIM Models and using BIM development duration as an experiment for AP to scope working design development timeline with BIM process included




BIM coordination ensured precise design execution and minimized conflicts, seamlessly integrating architectural elegance with urban infrastructure through comprehensive design reviews.


Through advanced 3D visualization, our BIM models seamlessly transformed complex designs into precise construction-ready documentation, ensuring the architectural vision is vividly realized in the physical structures.


Seamless clash detection through BIM technology ensured structural harmony and operational efficiency, enhancing the building's lifecycle and fostering a resilient urban landscape.
お見積もりをご依頼ください — サービス: BIM Production · タイプ: Condominium · 面積: 100,000 ㎡ · Duration: 5 months — 1営業日以内にご連絡いたします