
プロフェッショナル BIMチーム
年
2022
プロジェクトステータス
Completed
プロジェクトタイプ
Mixed-uses
期間
12 ヶ月
クライアント
Times Enterprise
One Bangkok R1 zone Interior Modeling, We work under the great interior contractor - Times enterprise, to build the BIM Model interior discipline to combine with other contractors in a high level of detail together with the shop drawings process. Including the lease line to split the rentable (Bare shell) area from the public area. The model elements have to include the installation and Integrate




BIM coordination and clash detection ensured seamless integration of complex structures, reducing on-site conflicts and enhancing design precision visible in the intricate interior layouts.


Through meticulous design coordination, our BIM deliverables translated comprehensive digital models into precise construction-ready documentation, ensuring seamless integration and accuracy in the physical execution of complex architectural elements.


As-Built Modeling through BIM ensured precise integration of design elements, enhancing facility management and sustaining the project's lifecycle with seamless transitions from digital concept to tangible infrastructure.
お見積もりをご依頼ください — サービス: Interior Production · タイプ: Mixed-uses · 面積: 5,000 ㎡ · Duration: 12 months — 1営業日以内にご連絡いたします