
ทีม BIM มืออาชีพของเรา
ปี
2021
สถานะโครงการ
Completed
ประเภทโครงการ
Central Utilities Plant
ระยะเวลา
18 เดือน
ลูกค้า
Thai Takasako
At The Forestias, we use a central utilities plant building to provide cold water for each individual residence in order to reduce CO2 release in the air and lower surrounding temperature. Hook provide BIM consultancy service to coordinate installation details between main contractor and CM and provide shop drawing after clash detection process to work continuously with the construction site.




BIM coordination through clash detection ensured design precision by resolving spatial conflicts, resulting in seamless integration of the utilities plant with the surrounding architecture.


BIM deliverables transformed digital models into precise shop drawings, ensuring seamless translation from concept to construction for efficient cold water distribution at The Forestias.


As-built modeling in BIM captured comprehensive details, enhancing facility management and extending the building's lifecycle through precise digital-physical integration.
รับใบเสนอราคา — บริการ: BIM Management · ประเภท: Central Utilities Plant · พื้นที่: 10,000 ตร.ม. · Duration: 18 months — เราจะติดต่อกลับภายใน 1 วันทำการ