
Our Professional BIM Team
Year
2023
Project Status
Active
Project Type
Hospital
Duration
18 months
Clients
Antnest Holdings (thailand)
The SHOSPITAL project, commissioned by Antnest Holdings (Thailand), exemplifies the advantages of advanced BIM management in the healthcare sector. Spanning 25,000 sq.m., our BIM services facilitated enhanced collaboration, ensuring precision in the construction process. By employing a comprehensive BIM methodology, we streamlined coordination, minimized RFIs, and delivered construction-ready documentation, ultimately optimizing project delivery and ensuring a seamless facility handover.




Utilizing BIM coordination and clash detection, we ensured flawless integration of structure and MEP systems, visibly enhancing the hospital's futuristic design with seamless precision and minimized construction conflicts.


Precision in BIM shop drawings seamlessly translated digital blueprints into construction-ready documents, ensuring the hospital's futuristic design was realized with accuracy and efficiency.


As-Built Modeling ensured the SHOSPITAL's digital precision mirrored its physical form, enhancing lifecycle management and delivering a seamless, enduring healthcare facility.
Get our quotation — Service: BIM Management · Type: Hospital · Area: 25,000 sqm · Duration: 18 months — we will reach out within 1 business day