
Our Professional BIM Team
Year
2016
Project Status
Completed
Project Type
Condominium
Duration
6 months
Clients
DB Studio
Hook also provide BIM Modeling and drawing production service in design stage. During develope The Base - Phetkasem 29, we provide full scale of service in such a short notice (2 months) to produce tender and construction drawings from the BIM model and send out as a package to contractor as a reference for provide shop drawing.




Through meticulous BIM coordination and design review, we ensured design precision and minimized conflicts, resulting in a seamless integration of architectural and structural elements visible in the final construction.


Immersive 3D visualization seamlessly transformed digital models into precise, construction-ready documentation, ensuring the architectural integrity of The Base - Phetkasem 29 from concept to reality.
Get our quotation — Service: BIM Production · Type: Condominium · Area: 35,000 sqm · Duration: 6 months — we will reach out within 1 business day