Skip to content
Central Utilities Plant @ The Forestias
Thai Takasako
MQDC Town Royal Residense

Central Utilities Plant @ The Forestias

#BIM Management

Our Professional BIM Team

Thongchad Boonyou
Pansika Buree
Thotsaporn Hiruntammaporn

Year

2021

Project Status

Completed

Project Type

Central Utilities Plant

Duration

18 months

Clients

Thai Takasako

ArchitectureStructureMEPInteriorLandscapeFacade

At The Forestias, we use a central utilities plant building to provide cold water for each individual residence in order to reduce CO2 release in the air and lower surrounding temperature. Hook provide BIM consultancy service to coordinate installation details between main contractor and CM and provide shop drawing after clash detection process to work continuously with the construction site.

Central Utilities Plant @ The Forestias - Image 1
Central Utilities Plant @ The Forestias - Image 2

BIM coordination through clash detection ensured design precision by resolving spatial conflicts, resulting in seamless integration of the utilities plant with the surrounding architecture.

Central Utilities Plant @ The Forestias - Image 3

BIM deliverables transformed digital models into precise shop drawings, ensuring seamless translation from concept to construction for efficient cold water distribution at The Forestias.

Central Utilities Plant @ The Forestias - Image 4

As-built modeling in BIM captured comprehensive details, enhancing facility management and extending the building's lifecycle through precise digital-physical integration.

RELATED PROJECTS

Interested in a similar project?

Get our quotation — Service: BIM Management · Type: Central Utilities Plant · Area: 10,000 sqm · Duration: 18 months — we will reach out within 1 business day

Chat with us