Skip to content
Lakeside 2
Laguna Phuket

Lakeside 2

#BIM Production

Our Professional BIM Team

Thanesuan Changnawa
Krittanai Panyaluang
Thotsaporn Hiruntammaporn

Year

2025

Project Status

Active

Project Type

Condominium

Duration

8 months

Clients

Basic Design

Structure

Lakeside2, a premier condominium project by Basic Design, showcases our expertise in BIM production. Leveraging advanced BIM methodologies, we conducted thorough design reviews and 3D visualizations, ensuring precision and clarity throughout the process. Our clash detection services significantly reduced RFIs and coordination issues, streamlining project execution. By providing construction-ready documentation and facilitating design coordination, our BIM services have enhanced project efficiency and accuracy, ultimately ensuring a seamless handover of this 26,000 sq.m. development.

Lakeside 2 - Image 1
Lakeside 2 - Image 2

Through meticulous design review, Lakeside2 showcases seamless integration of architectural elements, ensuring precision and coherence in the complex's form and function.

Lakeside 2 - Image 3

Precision in design authoring enabled intricate architectural forms, ensuring seamless integration of complex structural elements and optimizing spatial efficiency through meticulous digital construction methodologies.

Lakeside 2 - Image 4

Advanced 3D visualization techniques transformed conceptual designs into vivid structural realities, enabling precise spatial comprehension and ensuring the design intent was accurately realized in the final construction of Lakeside2.

RELATED PROJECTS

Interested in a similar project?

Get our quotation — Service: BIM Production · Type: Condominium · Area: 26,000 sqm · Duration: 8 months — we will reach out within 1 business day

Chat with us