Skip to content
One Bangkok MRT Entrance Link
Times Enterprise

One Bangkok MRT Entrance Link

#BIM Production

Our Professional BIM Team

Thongchad Boonyou
Pansika Buree
Siraphatson Srilakot

Year

2025

Project Status

Completed

Project Type

Special

Duration

4 months

Clients

Times Enterprise

Interior

MRTLINK, a special project by Times Enterprise, leverages advanced BIM production services to enhance the design and construction processes. Our comprehensive BIM methodology includes design coordination and clash detection, significantly reducing RFIs and coordination issues. With detailed shop drawings, we deliver construction-ready documentation, ensuring seamless project execution. Additionally, our 3D visualization capabilities facilitate effective design reviews and site utilization planning, ultimately adding substantial value to the project through improved accuracy and efficiency.

One Bangkok MRT Entrance Link - Image 1
One Bangkok MRT Entrance Link - Image 2

BIM coordination through clash detection ensured design precision for MRTLINK, seamlessly integrating complex geometries and minimizing onsite conflicts, as evident in the project's streamlined structural layout.

One Bangkok MRT Entrance Link - Image 3

Precision-engineered shop drawings transformed digital models into construction-ready documentation, seamlessly guiding the intricate assembly of MRTLINK's architectural elements visible in these images.

One Bangkok MRT Entrance Link - Image 4

MRTLINK's as-built BIM modeling ensures long-term project value by aligning digital precision with physical structures, enhancing operational efficiency and lifecycle management.

RELATED PROJECTS

Interested in a similar project?

Get our quotation — Service: BIM Production · Type: Special · Area: 1,500 sqm · Duration: 4 months — we will reach out within 1 business day

Chat with us