Skip to content

FACTORY &
PLANT BIM

BIM modeling, coordination, and as-built drawings for factories and industrial plants in Thailand — partnered with Japanese EPC contractors across the Eastern Seaboard.

At a glance

Who it is for
Factories and plants in Thailand, delivered with Japanese EPC contractors in Rayong, Chonburi and Greater Bangkok.
Scope
Architectural and structural BIM, MEP and piping coordination, scan-to-BIM, shop drawings, site support, and as-built BIM with COBie.
Level of detail
LOD 300 for design, 350 for coordination, 400 for fabrication and 500 for as-built, agreed per element in the BEP.
Languages
Drawings in English and Thai; summaries in Japanese for project management.
Standards
ISO 19650 certified (BSI Kitemark KM 785974); familiar with JIS references.

Built for EPC delivery

BIM that fits the way Japanese EPC contractors work

Hook is a BIM consultancy that supports Japanese EPC contractors building factories and plants across Rayong, Chonburi, and Greater Bangkok. We extend your design team with experienced BIM modelers, MEP coordinators, and onsite surveyors who understand JIS references and the realities of Thai construction sites.

From design-stage modeling to clash detection and bilingual as-built drawings, every deliverable is mapped to ISO 19650 — the same information management standard used by global construction groups. Our BSI Kitemark certification is the third-party verification that our process actually conforms.

Scope of work

Architectural & Structural BIM

Coordinated Revit models for factory shells, office blocks, utility buildings, and plant rooms — issued in EPC-ready LOD 300/350/400.

MEP & Piping Coordination

Clash detection and routing for HVAC, electrical, fire-protection, process piping, and utility runs across mezzanines and pipe racks.

Point Cloud to BIM (Scan-to-BIM)

Site survey via terrestrial 3D scan, conversion to as-built BIM models for renovation, expansion, or facility management.

Shop & Coordination Drawings

Stamped construction drawings generated from coordinated BIM — issued bilingually (EN + TH) for site clarity.

Construction-Stage Support

Resident BIM modelers and onsite coordinators embedded with the EPC site team during construction.

As-Built BIM & COBie Handover

As-built BIM aligned with construction reality, plus COBie data for facility management handover with a 10-year data retention guarantee.

Standards & compliance

ISO 19650 (BSI Kitemark)

Information management process certified by BSI — Thailand’s reference standard for EPC BIM delivery.

JIS-aware delivery

Familiar with JIS references commonly cited by Japanese EPC contractors and able to cross-map to TIS / ASTM equivalents where required.

TOR-compliant submission

BEP, MIDP/TIDP, model audit, and federated coordination pack — ready for client-side BIM TOR review.

How we work with EPC teams

1. Scoping & BEP

Joint kick-off with your project manager and lead engineers. We agree LOD, deliverables, file structure, and review cadence in a project-specific BEP.

2. Modeling & Coordination

Discipline models authored in Revit. Weekly federated review with clash detection and resolution log issued to the EPC team.

3. Drawing Production

Stamped shop drawings and bilingual construction drawings issued from the coordinated model — single source of truth.

4. Construction Support

Onsite or hybrid modelers available during construction for RFI response, design changes, and as-built capture.

5. As-Built & FM Handover

Final as-built model, COBie data export, and handover documentation — ready for facility management.

Selected industrial projects

A glimpse of the factory and plant work we have delivered with Japanese EPC partners in the Eastern Seaboard.

Frequently asked questions

Can you work onsite at factory sites in Rayong or Chonburi?

Yes. We can station BIM modellers and coordinators with the EPC site team in Eastern Seaboard estates such as WHA, Amata, Hemaraj, Map Ta Phut and Pinthong, or deliver fully remotely.

What certification do you hold?

Hook Architects is certified to ISO 19650 (BSI Kitemark KM 785974) and works in line with ISO/IEC 27001 for information security. We currently support several Japanese contractors’ projects in Thailand.

Can drawings be issued in English, Thai and Japanese?

Construction drawings are issued in English and Thai for Thai site crews. Document summaries can be prepared in Japanese for project management review.

What LOD do you model to?

LOD 300 for design, LOD 350 for coordination, LOD 400 for fabrication and LOD 500 for as-built. The LOD for each element class is agreed in the BEP at kick-off.

How quickly can you mobilise a team?

For most projects, a core BIM team within 2–3 weeks of contract signature. Urgent renovation or shutdown work can start sooner, so contact us to discuss.

What do we receive at handover?

The final as-built model, a COBie data export and handover documents, ready for facility management.

Ready to brief us on your factory project?

Tell us about your site, scope, and timeline. We will respond within 2 business days with capability fit and an outline of how we would deliver.