Skip to content
VIA34 Condominium@Sukhumvit 34
DB Studio
Sansiri

VIA34 Condominium@Sukhumvit 34

#BIM Production

Our Professional BIM Team

Panotporn Sanit
Thongchad Boonyou

Year

2018

Project Status

Completed

Project Type

Condominium

Duration

8 months

Clients

DB Studio

Architecture

For the SKV34 condominium project, DB Studio engaged our BIM consultancy to deliver comprehensive BIM production services. Utilizing advanced methodologies, we implemented design review, clash detection, and design coordination to significantly reduce RFIs and streamline communication among stakeholders. Our 3D visualization capabilities enabled insightful project timelines, ensuring clarity and precision in construction-ready documentation. Ultimately, our BIM services enhanced project efficiency, fostering a smooth transition to accurate facility handover.

VIA34 Condominium@Sukhumvit 34 - Image 1
VIA34 Condominium@Sukhumvit 34 - Image 2

Through precise BIM coordination and design review, we ensured seamless integration and alignment, reducing design conflicts and translating detailed digital plans into the harmonious architectural features visible today.

VIA34 Condominium@Sukhumvit 34 - Image 3

Our advanced 3D visualization seamlessly translated digital models into precise construction-ready documentation, ensuring every architectural detail of SKV34 was crafted with unmatched accuracy and clarity.

VIA34 Condominium@Sukhumvit 34 - Image 4

Clash Detection in the SKV34 project optimized spatial configurations, mitigating construction issues and ensuring a seamless integration of structural and aesthetic elements that enhance the building's lifecycle efficiency.

RELATED PROJECTS

Interested in a similar project?

Get our quotation — Service: BIM Production · Type: Condominium · Area: 10,000 sqm · Duration: 8 months — we will reach out within 1 business day

Chat with us