Resident BIM modelers, surveyors, and coordinators embedded with your factory site team — closing the loop between design and construction.
When remote is not enough
For complex factory and plant projects, the gap between the design model and what is actually built on site is closed fastest by having a BIM engineer physically present. Hook embeds BIM modelers, MEP coordinators, and licensed surveyors into your EPC site office for the duration the project needs them.
Daily walkthroughs, real-time clash resolution, accurate as-built capture, and live RFI response — all logged back into the federated model. The result is fewer site stoppages, faster decisions, and a final as-built that genuinely reflects what was built.
Onsite scope
Full-time onsite modeler integrated with the EPC site team. Daily model updates, RFI response, design-change capture.
Senior coordinator handling multi-discipline clash resolution, contractor coordination meetings, and BEP enforcement.
High-density point cloud capture of existing facility, civil works, structure, and MEP — registered and aligned for BIM authoring.
Verification survey throughout construction and at completion. As-built BIM reflects actual constructed reality, not design intent.
Section cuts, RFI sketches, sleeve & opening updates, and contractor shop drawing review issued from site.
Onsite presence supplemented by the home office team for heavy modeling or rendering — capacity scales with project intensity.
Industrial estates we serve
Petrochemical, automotive, EV, and consumer-goods plants. Onsite teams routinely deployed.
Automotive, electronics, logistics, and assembly facilities across the Eastern Seaboard cluster.
Bangpoo, Bangchan, Bang Plee, and Wellgrow — for projects closer to the metropolitan area.
Share the project, site, and duration. We will respond with availability and engagement options.